Risk Assessment

Comprehensive Analysis

Generally, we will investigate the status of work in a short time (1-2 weeks).

Engineers will make judgments from the following aspects:

Equipment requirements and specifications

The criticality of the connecting parts

Technical evaluation of key parts 

Upon completing the investigation, engineers will submit a report detailing the possible problems in the construction process, system, equipment and operation, and work out a complete set of solutions.




The Key to Risk Assessment and Connection

It is very important to recognize the criticality of connecting parts and assess their grades. Risk level is used to manage the maintenance and inspection of special connection parts in the whole life cycle. The process methodology assesses the risks of different leakage possibilities and judges them by combining the experience of local engineers, but people are increasingly relying on historical data for assessment. HTS rates the criticality of the joint according to the possibility of leakage and the degree of damage, and considers specific conditions of the joint.


Risk Assessment Citeria

 


Potential hazard level

Low

Medium

High

Leakage possibility

Impossible

Low

Low

Low

Possible

Low

Medium

Medium

Probably

Medium

High

High




Contact Us

  • Tel:010-63748808 / 15811338118
  • E-mail:hts@htschina.com
  • Fax:010-83607808
  • AddressRoom 1601, Blog Xinghuo Keji, No.2 Fufeng Road, Fengtai District, Beijing, China
© 2020 Beijing HTS E&E Co., Ltd.  京ICP备17073741号-2  京公网安备 11010602103687号 Privacy statement